Projects
If you’d like to talk to us about a project, we’d love to hear from you.
SK Northwest
DESCRIPTION
Emerio provided civil improvements for this site along the east bank of the Willamette River near OMSI. Storm water quality was accomplished by the incorporation of two flow through planters situated on the building’s exterior wall. The City of Portland Presumptive Approach Calculator (PAC) was used to design this vegetated facility. Site grading consisted of two parking lots, a future offsite connection, building pad and retaining walls. A leg of the popular Springwater Trail was designed by Emerio Design. This design consisted of a twelve foot wide concrete bike/pedestrian path over the project length, calling for a sectional thickness to allow emergency vehicle access.