Projects
If you’d like to talk to us about a project, we’d love to hear from you.
Division Transit Corridor
Site of future improvements along SE Division Street
DESCRIPTION
As a subconsultant, Emerio is providing civil design and surveying for this enhanced 14-mile high capacity bus project extending from the north end of downtown Portland, to Gresham’s Cleveland Park and Ride via the Division Street corridor. Emerio is responsible for designing public street improvements to meet acceptable bus layover bays along multiple sections of this corridor, as well as retrofitting the Cleveland Park & Ride into a layover facility for double-articulated buses. Emerio also provided design-level topographic survey along this corridor.